Generator connections into the AusNet Services (AST) Distribution Network, are classified as embedded generator connection. The AST distribution network is, generally, defined as all parts of the AST network which operate at 66kV or lower.
This page sets out the process, indicative costs and time frames of embedded generator connections with generation capacity of 5 MW of greater.
Connections into the 220kV (and above) network are considered connections onto the Victorian Transmission Network. The Australian Energy Market Operator (AEMO) manages the connection process for all Victorian Transmission connections and will be your main point of contact. For more information please visit their website.
Need more information?
Email us at energyconnectionsSG@ausnetservices.com.au
Don't know where to connect?
Use the Renewable Energy Map to check the available capacity of the our Distribution Network.
There are 6 main stages in the process to connect generation capacities of 5 MW or greater to the AST Distribution Network. For a detailed outline of the full connection process please see the Distribution Connection Process Map.
For a list of previously connected embedded generation projects, please download our Register of Completed Embedded Generation Projects. This list is published with our existing customers’ consent.
For all questions or enquiries please contact the Energy Connections Team, energyconnectionsSG@ausnetservices.com.au.